![]() A wide range of tabular and graphical outputs is available. Operating costs are computed based on energy use and demand charges. Energy analysis uses full 8760 hours-per-year analysis to evaluate the operation of a wide variety of air handling and plant equipment. System components are sized using the System-Based Design concept, which applies the ASHRAE-endorsed Heat Extraction Methodology to link system performance to building thermal loads. Thermal loads are calculated using the ASHRAE-endorsed Transfer Function load method. Your friend in indoor comfort & safety systems Indoor Comfort Systems, Building Control Systems, Fire Control & Supression Systems Cooling / Heating Load Software CARRIER HAP (Hourly Analysis Program) ($1495 US / $2050 Canadian) HAP is a dual function program - full-featured load estimating and system sizing for commercial buildings plus versatile hour-by-hour energy and operating cost analysis. Which applies the ASHRAE-endorsed Heat Extraction. ![]() Uses the same load calculation method as HAP and System Design Loads. The product will soon be reviewed by our informers. › ▲▲▲ Camel Heat Load Calculation SoftwareĬamel Air Conditioning Load Estimation.The most popular version of this product among our users is 5.0. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |